|
|

It took Nora and I two weeks to assemble and level this beast.
About three / fourths of the holes were pre-drilled ... the
rest we had to drill based on how level the ground is that you
assemble it on. The legs of the entire playset are free
standing, so no cementing of posts was required. Shannon
loves playing on it and so do several of the neighbor
kids!
|
 |
 |
|
|