The floor of the crawl space/basement is about 4' below ground
level.
The first step was to dig a big hole where the
door would be placed.
The next step was to have a cement
cutter come out and saw out a big hole in the foundation, remove
the siding, finish by cutting a hole in the OSB and putting in a
header beam for the door.
These are the foundations for
the retaining walls cement pour.