The floor of the crawl space/basement is about 4' below ground level.

The first step was to dig a big hole where the door would be placed.

The next step was to have a cement cutter come out and saw out a big hole in the foundation, remove the siding, finish by cutting a hole in the OSB and putting in a header beam for the door.

These are the foundations for the retaining walls cement pour.