Now we're finally starting to see the main design coming together.
The granite has been added to the vanity, tub deck, tub deck
step and shower seat and the shower tile has been installed.
Missing yet are the shower floor tile, the glass accent tile,
the tub, sinks and toilet. No tile grouting has been done
yet either.