|
|

The entire left side of the room will now be the shower area.
Here they have plumbed for the new dual shower controls and
drain and have cut out the rest of the wallboard in prep for the
shower tile backerboard installation. They have also
installed the new recessed centered tub deck and shower lighting
in the ceiling with the old tub deck recessed light hole to fill
yet. |
 |
 |
|
|