|
|

Day 7 - Detail on center support beams in place, cedar tongue
and groove ceiling finished (except trim around skylights),
electrical switch installed.

I asked them to minimize the amount of stop material used (thin strips of trim to hide seams). They
did a beautiful tight job of putting the ceiling in with no stop material. |
 |
 |
|
|