|
|

Day 13 - Everything is done except the glass in the railing
for the steps, the siding reinstalled on the house, and the
painting. The painting will have to wait until spring,
but the cedar slats below the deck, the railing, steps and all
the exterior facia will be painted house colors. The
interior will get a coat of lightly tinted Sikkins clear
sealant. |
 |
 |
|
|