Day 12 (halfway through) - There was concern over the weight
of the double layered shingles that were put on the roof, so
some more vertical support posts were cemented in below the deck
and knee braces were added. The old floor boards were
removed and the AZEK decking was installed. The
gutters and downspouts were installed. The steps and
railing were added. All the glue-lam support beams were
covered with cedar facia. Today the glass for the
railing and the railing for the steps were added. |
 |
 |
|
|